Project Details

DDF provided design and installation of a sheet pile shoring system to allow construction of a secondary water pumping station on the edge of Utah Lake.

Protection for excavations up to 30 feet deep, as well as a cofferdam separating approx. 10’ deep water in the harbor from construction of the intake structure.

  • Engineer: Gerhart Cole
  • General Contractor: Cop Construction LLC
  • Work Description: Design and Installation of Sheet Pile Shoring Systems
  • Completion: May 2017