Project Details

The Vineyard Connector project included new roadway through the old Geneva Steel site, with a new bridge over active UPRR and UTA railroad tracks.

DDF drove 16” x ½” wall pipe piles to depths of up to 93 feet in (2) abutment locations for the new bridge.

  • Engineer: UDOT
  • General Contractor: W.W. Clyde
  • Work Description: Furnish & Install 16 x ½ wall Pipe Piles (approx. 2,600LF)
  • Completion: October 2014